Provided design and construction support for a new ISO 4 bay and chase cleanroom intended to serve numerous CMP, Etch, and Implanter tools. This is a 24,000 SF (nominal) cleanroom located in a converted warehouse space and includes a companion gown room and access to the mezzanine above it. It serves approximately 18 CMP tools, 25 etch tools, and 22 implant tools and is classified as H-5 occupancy. The project was designed to allow construction to occur in tandem with the day-to-day operations with minimal need to shut the fab down. The scope of work included providing base build infrastructure for the tools. Utilities, including power, heating and cooling, and process systems were provided or otherwise modified to serve the new cleanroom and support space.