Corbin Consulting served as the engineer of record for all HVAC, process, electrical, and control systems for a $500M, 400,000 sq. ft. semiconductor factory space. Project elements included group F-1 manufacturing spaces, group H-5 manufacturing spaces, and group H-2/H-3/H-4 hazardous material storage spaces. Corbin Consulting was responsible for the design of approximately 100,000 sq. ft. of Class 10,000 cleanroom, served by perimeter or rooftop-mounted recirculating units with integral HEPA filters. This fast-track design-build project was delivered within 18 months of contract signing and achieved LEED® silver certification from the U.S. Green Building Council.