The project involved a multi-year, comprehensive electrical power system study for three new hyperscale data centers, plus a massive supporting central utility building. The systems modeled were 345 kV substation, 25 kV distribution, medium/low voltage generation, 480/208 V low voltage distribution, DC service distribution, UPS, and lighting inverter systems. System models were created from drawings, submittals, and field information, and subsequent studies included short-circuit analysis, protective device selective coordinate course, arc flash incident energy calculation, arc flash label creation, MV protective relay settings, and recommendations for arc flash incident energy reduction.